General Design

General Design Service Packages

Synopsis Sheet for General Services

 

Code ISA.12 – Transmission Line Design & Gerber Design Review
Deliverables

PCB Transmission Line Design

Item

PCB transmission line design Gerber file review

Time

2 Days

Download

ISA.12

Code ISA.20 – Detailed Performance and Certification Readiness Review
Deliverables

Report and interactive technical support

Item

Detailed analysis of design documents including schematic, PCB layout, BOM & mechanical models.
Specific recommendations from the component level up to the system architecture level in order to minimize the risk of performance and certification problems for all radios in the system.
Schematic recommendations
PCB layout recommendations
BOM recommendations
Mechanical recommendations
High level design verification test plan, what kind of testing will be needed to prove the design works
High level certification test plan, what certification tests will be needed and what order to do them in

Time

3 Weeks

Download

ISA.20

Code ISA.21 – Detailed RF Performance
Deliverables

Report and interactive technical support

Item

Detailed analysis of design documents including schematic, PCB layout, BOM & mechanical models.
Specific recommendations from the component level up to the system architecture level in order to minimize the risk of performance and certification problems for all radios in the system.
Schematic recommendations
PCB layout recommendations
BOM recommendations
Mechanical recommendations

Time

3 Weeks

Download

ISA.21

Code ISA.40 – Multi-Antenna Isolation Measurement
Deliverables

Antenna Isolation Report

Item

Antenna installed on a customer device prototype board, with extra antenna prototypes.
Multi-Antenna isolation performance matrix

Time

3 Days

Download

ISA.40

Code ISA.50 – Passive Mode Antenna Testing
Deliverables

Antenna Performance Report

Item

Antenna installed on a customer device prototype board, with extra antenna prototypes
Matching circuit diagram and documentation of values if relevant (or cable routing diagram, antenna position/mounting etc.
Final antenna position and integration method
PCB layout recommendations
Return loss, VSWR, Average gain, Efficiency, Peak Gain, Radiation Patterns
Documented performance measurements

Time

3 Days

Download

ISA.50

Code ISA.51 – Passive Mode Terminal and External Antenna Testing
Deliverables

Antenna Performance Report

Item

Antenna installed in a customer device
Real-world antenna performance: antenna mounted in a vehicle
Efficiency, Peak Gain, Radiation Patterns for four (4) frequencies
Documented performance measurements

Time

3 Days

Download

ISA.51

Code ISA.10 – Initial System Review & Analysis
Deliverables

Report and interactive technical support

Item

High level system review to define
Antenna performance requirements analysis
Antenna selection options
Antenna Integration Plan

Time

2 Days

Download

ISA.10

Please contact Taoglas to get started with these services today.

For orders, samples and services please click on the request a quote button below.

Request a Quote